Description: This being 11 floors of 101 luxury apartments.
Mechanical and Public
Heath Services
All cast iron suspended soil, vent
and rainwater
pipe work including foul and surface water pumping
stations.
All mains and boosted water services
including tanks, booster sets, distribution and riser pipe work.
VRV three-pipe air conditioning – cooling
and heating to prow end apartments and penthouses.
Under floor heating to all apartments.
Hot and cold water services.
Under ground infrastructure/car park pulse ventilation
system.
Electrical Services
General power and lighting for infrastructure.
General lighting and power for apartments including
mode lighting.
Fire alarm system.
Security system.
TV and satellite installation.
Sound system.
External street lighting.
Riverside and landscape lighting.
Due to performance and quality of works air
cool engineering ltd has subsequently won Phase 2 being Block
B, 14 floors, 124 luxury apartments, value £5.7 million.