Battersea Reach, London

Contract History

Contract Value: £9 million

Programme: Phase 1 Blocks C & D - 14 months
Client: St George South London Ltd

Description:
This being 11 floors of 101 luxury apartments.

Mechanical and Public Heath Services

All cast iron suspended soil, vent and rainwater

  pipe work including foul and surface water pumping stations.
All mains and boosted water services including tanks, booster sets, distribution and riser pipe work.
VRV three-pipe air conditioning – cooling and heating to prow end apartments and penthouses.
Under floor heating to all apartments.
Hot and cold water services.
Under ground infrastructure/car park pulse ventilation system.

Electrical Services

General power and lighting for infrastructure.

General lighting and power for apartments including mode lighting.
Fire alarm system.
Security system.
TV and satellite installation.
Sound system.
External street lighting.
Riverside and landscape lighting.

Due to performance and quality of works air cool engineering ltd has subsequently won Phase 2 being Block B, 14 floors, 124 luxury apartments, value £5.7 million.

Close this window